Neon drop · Free ship $75+ · Enter the grid
Signal · Product Feed

Control Room Entrance Colour:Raw The boiler house formed the

SKU: 23631291370

4.2
SEK100.00 SEK130.00

Pay in 4 interest-free payments of $25.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Sep 5 - Sep 10

Live Spec

Control Room Entrance Colour:Raw The boiler house formed theThe entrance to the Hornsby Quarry control room stands open, its concrete walls and steel frames showing the wear of decades of active quarrying. The structure is part of the remnant crusher plant buildings that survived the quarry's closure in 2002, when CSR Construction Materials ended nearly a century of dolerite extraction on the site. Part of the Hornsby Quarry series.

Store: gaabil.dk · Domain: gaabil.dk

Description

The boiler house formed the central and tallest section of Station No

A tap hole opens on one of Port Kembla Steelworks' basic oxygen steelmaking vessels

Snow load has been working on this building for years

lifting dust from the decaying timber below

rust streaking down its faded plastic in long ochre lines

Control Room Entrance Colour:Raw The boiler house formed theThe entrance to the Hornsby Quarry control room stands open, its concrete walls and steel frames showing the wear of decades of active quarrying. The structure is part of the remnant crusher plant buildings that survived the quarry's closure in 2002, when CSR Construction Materials ended nearly a century of dolerite extraction on the site. Part of the Hornsby Quarry series.

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products